Amberley Publishing - Transport, Military, Local and General History

Anglesey Railways Through Time

Availability: In stock

A railway arrived on Anglesey in 1848, linking London and Dublin. It was the great railway engineer Robert Stephenson who ensured that the railway link to Ireland would run along the North Wales coast to Holyhead when he presented plans that overcame the engineering challenges associated with the route. A branch was subsequently built from Gaerwen to Amlwch after the LNWR absorbed the CHR. This Anglesey Central Railway was first opened in around 1865 and completed in 1867. The LNWR won the contract to carry the Royal Mail by rail, but it was the City of Dublin Steam Packet Company that carried the mails across the Irish Sea. The LNWR did, however, build a magnificent inner harbour in the 1880s. The railway still runs from London to Holyhead and boats continue to sail from Holyhead to Ireland, but today only the Llanfair P.G., Valley (which serves the RAF base) and Holyhead stations remain.

Book ISBN 9781445608716

Book Format Paperback

pages 96 pages

Publication Date 13 Feb 2014

Height 165

Width 235

Illustrations 180

Regular Price: £14.99

Special Price: £13.49

Newsletter Signup

Monthly Top 5 Books

Reviews

Write Your Own Review

Only registered users can write reviews. Please, log in or register